Common Description
Outfitted with all the zero leak bidirectional checking sole-noid valves, this power unit is made to the operation of two independent circuits. Which are respectively for that major and subordinate platforms with the double scissors lift. Two cut-off valves are utilised for decreasing the machine manually in situation of power loss. If additional independent circuits are essential to your application please speak to us for availability.
Remark: one. Please talk to our sales engineer to the unique pump displacement, motor energy or tank capacity.
two. CSA or UL certified motors are available on request.
Unique Notes
one. The AC motor is of S3 duty cycle, which may only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean every one of the hydraulic elements concerned just before set up of the electrical power unit.
3. Viscosity of your oil shoud be 15~46 cst,and also the oil ought to be clean and totally free of impurities,N46 hydraulic oil is advised.
four. The electrical power unit ought to be mounted vertically.
5. Check the oil level during the tank right after the initial operating of your power unit.
6. Oil shifting is required after the original a hundred operation hrs,afterwards once every single 3000 hrs.