SMR Gearbox Set up
Satisfactory overall performance is determined by right installation. lubrication and upkeep. consequently it is necessary that the instructions in the installation and servicing leaflet. supplied with each gearbox. are followed meticulously. a few of the critical elements of belt and torque-arm set up are listed under.
1. Install pulley on gearbox input shaft as close for the reducer attainable, and mount reducer on driven shaft as shut to bearing as practical. failure to carry out this may bring about excess loads inside the input shaft bearings and output bearings and could induce their premature failure.
two. Install motor and wedge belt drive together with the belt pull at roughly 90° towards the center line in between driven and input shafts. this may permit tensioning of the wedge belt drive together with the torque arm which should ideally be in tension. if output hub runs anti-clockwise. torque arm need to be positioned the proper.
3. lnstall torque-arm fulcrum on a rigid support in order that the torque-arm will probably be at somewhere around appropriate angles for the center line through the driven shaft along with the torque arm case bolt. make certain there is certainly enough consider up inside the turnbuckle for belt tension adjustment.
Continue to keep near.
Bell drive can be located in any handy postion. should the torque arm would be to be used to tighten the belts, the drive should be at about tight angle on the line among the input and output shafts.
Bell drive could be located for the appropriate if sought after.
If output hub rotates clock-wise. position belt drive and torque arm in opposite course to that proven during the illustration.
Torque arm and belt take up.
Torque arm might be mounted for the ideal if sought after.